Hello Hollywoodlanders,
Starting on Tuesday, March 25th, Recreation and Parks will be constructing a wrought iron gate at the top of Beachwood that will block vehicular access to the Hollyridge Trailhead. Construction on the gate is expected to last several weeks, during which time the trailhead will be shut down because of construction hazards. Once complete (within 6-8 weeks), the gate will serve as a pedestrian entrance to the Hollyridge Trailhead, from sunrise to sunset, and will be locked overnight. After that, the only vehicles allowed beyond the gate will be those of Sunset Ranch and Rec and Parks.
Thanks,
Lucy Gonzalez
President, HHA